One method of analysis to evaluate construction project planning with the aim of saving budget costs, optimizing performance and time efficiency and still paying attention to the quality of the work is to use Value Engineering. The main reason for this method of analysis is a systematic and directed evaluation approach to the object being reviewed. The stages in the Job Plan are the Information, Creative, Analysis and Recommendation Phases by determining which activities have the highest costs, then analyzed to determine alternative comparisons to the Life Cycle Cost with the classification of basic functions and secondary functions to obtain a Cost / Worth ratio.
kata kunci :
Value Engineering, Job Plan, Life Cycle Cost, Cost / Worth